About Modular
Acorn Development began building in Boston proper. Now we have built homes from Cape Cod to the New Hampshire. Projects include duplexes, three families, capes colonials, townhomes, and Victorians.
References
Pre and Post Set
** Please note that onsite responsibilities may vary pending on home type and location..
Site Preparation
Plans
Permitting
Site Cleaning & Demo
Excavation
Foundation/Slab (Modular home requirements)
Pressure treated sill plates
Set Day “clear path” to site for crane and modules
- Crane
- Police detail (as required)
- Set Crew
- Roof Installation
- Tyvek
- Secure Crew
Post Modular Set
Connector all "Boxes" from top to basement
- Plumbing Connections
- Electrical connections
Service Connection
- Water (Public or Well)
- Sewer (Public or Septic)
- Electric
- Gas
Install Mechanical Systems
- Hot Water Baseboard
- Central Air Heat and Air Conditioning
- Hot water heater
Install rake boards and soffits
Siding (shipped loose)
- Vinyl
- Shingle
- Hardiplank
- Brick
Decks/Porches
- 2nd Means of Egress
Interior stairs to basement
- all other interior stairs delivered rough
Flooring and interior stair finish
- Hardwood
- Ceramic
- Carpet
Trim
- Baseboard
- Doors
- Windows
- Case Openings
Finish Marriage Seams
Finish Paint: walls and trim come primed in stock color
Appliances
Certificate of occupancy